All project experience

Current & awarded programme · Donk River corridor, Assam

OIL India Donk River 14-inch HDD Crossing

A newly awarded 14-inch crude-oil pipeline crossing combining approximately 600 metres of HDD with adjoining normal pipeline laying and OFC-duct work.

Programme statusAwarded

ClientOil India Limited
Project record17 July 2026
Pipeline14-inch crude-oil pipeline with OFC duct
ScaleApprox. 600 m HDD + 150 m normal laying

Recorded scope

The delivery brief.

Major river HDD crossing

  1. 01Crossing survey and profile coordination
  2. 02Pilot drilling, reaming and 14-inch product-pipe pullback
  3. 03Approximately 150 metres of adjoining normal pipeline laying
  4. 04Associated OFC duct, testing, reinstatement and crossing records

A similar scope?

Start with the route and delivery constraints.

Discuss your project